RESIDENTIAL | 2 kW

Kaval Power installed a 2kWp solar power system and helped Mr. Bedi achieve his aim of going green. This solar installation generates 2,920 units of electricity annually.

Project Details

Total Electricity Generation from Solar power plant

2,920 units

Annual Generation

73,000 Units

Lifetime Generation (25 Year):

Financial Savings

Tariff

(for top slab of tariff):

No increase assumed for 25 years

@ 8.3/ kWh

24,236/-

Annually in Rupees

61 Tonnes

Carbon Dioxide Emissions Mitigated

98 Teak trees

This Installation will be equivalent to planting teak trees over the life time.

Contribution to Environment

Disclaimer: The calculation is indicative in nature. Generation may vary from location to location