Mr. Rohitesh – Race Course Rd

RESIDENTIAL | 8 kW

Kaval Power installed a 8kWp solar power system and helped Mr. Rohitesh achieve his aim of going green. This solar installation generates 11,680 units of electricity annually.

Project Details

Total Electricity Generation from Solar power plant

7,200 units

Annual Generation

1,80,000 units

Lifetime Generation (25 Year):

Financial Savings

Tariff

(for top slab of tariff):

No increase assumed for 25 years

@ 8.3/ kWh

99,280/-

Annually in Rupees

246 Tonnes

Carbon Dioxide Emissions Mitigated

392 Teak trees

This Installation will be equivalent to planting teak trees over the life time.

Contribution to Environment

Disclaimer: The calculation is indicative in nature. Generation may vary from location to location