top of page

Ms. Leelavathi Balaji – Rajiv Gandhi Nagar

RESIDENTIAL | 7 kW

Kaval Power installed a solar power system and helped to achieve the aim of going green. Annual Generation is around 10220 units. C02 Emissions Mitigated 215.6 tonnes (25 years).Equivalent Teak Trees planted 343.7

Project Details

Total Electricity Generation from Solar power plant

10,220 units

Annual Generation

2,55,500units

Lifetime Generation (25 Year):

Financial Savings

Tariff

(for top slab of tariff):

No increase assumed for 25 years

@ 8.3/ kWh

84,826/-

Annually in Rupees

215 Tonnes

Carbon Dioxide Emissions Mitigated

343 Teak trees

This Installation will be equivalent to planting teak trees over the life time.

Contribution to Environment

Disclaimer: The calculation is indicative in nature. Generation may vary from location to location

Project Gallery

KavalPower smaller logo-hr-final-240.png

Registered Address

No.10, Pipeline Road, Mallasandra,
Bangalore 560057,Karnataka, India
GSTIN: 29AAFCK9564M1ZN

© 2022 by Kaval Group. Designed by Consult Yoga

Operations

237 Ground Floor, 4th Main Road, Rajiv Gandhi Nagar, 2nd Stage,

Bengaluru

Karnataka 560097

Warehouse

No. 122/2, Kodagalahatti, Hunasamaranahalli Jala Hobli, Yelahanka, Bengaluru, Karnataka 562157

Namibia Address

No.12, Villa Chasie, Chasie Street,
Kleine Kuppe, Windhoek, Namibia

+91 9535300288 / +91 9148102115

  • Facebook
  • LinkedIn
  • Instagram
  • Youtube
bottom of page